Selected work
Rehabilitation case studies
Client and site details are withheld for confidentiality. Project facts reflect documented scopes of work.
Municipal wastewater lift station
Lift Station Concrete Rehabilitation & Protective Coating
A wastewater lift station showed concrete deterioration from a long-term aggressive environment, including hydrogen sulfide exposure and moisture intrusion.
Read case studyNeutralization well
Neutralization Well Concrete Rehabilitation & Protective Coating
A neutralization well required rehabilitation to withstand acidic and alkaline chemical exposure, pH cycling, moisture intrusion, and abrasion.
Read case studyMunicipal RO drinking-water treatment train
Reverse Osmosis Membrane Changeout
A municipal reverse osmosis treatment train required a complete membrane changeout to restore performance, executed within a tight six-day shutdown window under strict contamination control.
Read case studyHave a rehabilitation project in mind?
Tell us about your structure and service conditions. We'll help you scope the work.
