Municipal RO drinking-water treatment train
A municipal reverse osmosis treatment train required a complete membrane changeout to restore performance, executed within a tight six-day shutdown window under strict contamination control.
The RO train was returned to service on schedule with all 420 replacement elements installed and verified vessel-by-vessel, supported by documented QA/QC at each hold point.
On site
Photos captured across the phases of the project.
1
2
3
4Capabilities
Controlled RO membrane changeouts with vessel inspection and startup support.
Learn moreDocumented inspection hold points from evaluation through acceptance.
Learn moreOngoing support for water and wastewater treatment infrastructure.
Learn moreTell us about your structure and service conditions, and we'll help you scope a rehabilitation plan.